What will cause a primary BSC to failover to a standby BSC?

Version 1

    Q: What will cause a primary BSC to failover to a standby BSC?

     

    A:

    1. Losing link status on either the protected, managed, or failover interfaces

     

    2. Losing power either abruptly or with a graceful shutdown

     

    3. Internal crash due to a software failure

     

    4. Exceeding preset thresholds

    -High Average CPU/Memory Utilization

    -Hard Disk Usage


    Preset thresholds are configured in the web based administrative console under General>thresholds.